For more than 30 years, RH Price has been the professional construction and service team governments and utility companies trust.

icon_widget_image Monday-Friday: 9am to 5pm; Saturday: 10am to 2pm icon_widget_image 5226 Beatties Ford Rd. Charlotte, NC 28216 icon_widget_image info@rhprice.us icon_widget_image 704-395-0672
s

Arrowood-Sulkirk 24-Inch Water Main Replacement, Charlotte, NC

Arrowood-Sulkirk 24-Inch Water Main Replacement, Charlotte, NC

Client: Charlotte Water
Project Date: April 2015
Contract Value: $4.15 million (final cost delivered below bid)
Scope of Work:

  • Furnishing and installing approximately 11,700 linear feet of 24-inch ductile iron pipe water transmission main including fittings, valves, and appurtenances.
  • Installation replaced two existing 24-inch water mains.

The project consisted of furnishing and installing approximately 11,700 lf of 24” diameter ductile iron pipe water transmission main including fittings, valves and related appurtenances necessary for a complete and working installation to replace two existing 24” diameter sections of water mains scheduled to be abandoned.

Project Info

Category: