Progressive Design Build – South Boulevard Water Main, Charlotte, NC
Client: Charlotte Water Project Date: October 2021 estimated completion Contract Value: $15 million Scope of Work:
10,000 linear feet of 24-inch water main with multiple 12-inch, 8-inch, and 6-inch water lines to side streets, meters, fire lines, and appurtenances.
Tie in to existing water line connections.
Rehabilitation of sewer.
Roadway restoration including asphalt and concrete
Special considerations for this project include a heavily trafficked area with limited work area available. We have innovated a conveyor system to move material without bringing in additional trucks and equipment and hydro excavation will be used to expedite construction.